中文版 英文版  
 
Service
Quality System
Detection
Instruction
 
 
Pipe laying Oil pipeline
Construction site Pipeline welding
   
1.Welding seam jont
When the grooves at end are jointed,the requirements and the criterions must be met.During welding,you must select the suitable welding method with welding parameters,welding rod,welding straightness meeting the requirements and criterions.The stringer bead must be even and consistent.The surface of welding seam must have no burnoff,flaw,lump,ncluded slag and air hole.
2.Screw joint
When jointing,the process precision of the pipe screw must meet the norm.It must be clean and neat with broken and lost buckles less than 10% total buckles,fastened jointing,the exposed pipe screw not more than 2 buckles,anti-corrosion treatment and no exposed packaging at the joints.
3.Flange joint
When jointing,it should be parallelly and closely jointed and vertical to the central line of the pipe,consistent with the length of the exposed screw out of nut and not bigger that half diameter of the screw,nut at the same side of flange.The material of spacer must meet the requirements of design and the norm.Painting must be even with no missing paint and peel.
4.No seepage happens when passing over mediums.
 
Pipe
Pipe fittings
Flanges
High pressure products
Pipe bending
Elbow pushing
Groove processing
Flange processing
Spectral analysis
Metallurgical analysis
Non-destructive detection
Mechanical test
 
  Add:Mengcun county,Hebei Province,China
Tel:+86-317-3516201 3516202 Fax:+86-317-3516203 E-mail:azaly@sina.com  info@azaly.net   azaly365@hotmail.com 备案号:冀ICP备09004982号